    Soil boring and rock coring

    Method of Statement for Soil boring and rock coring are follows:

    Drilling

    Drilling in the boreholes is carried out using rotary wash drillings rigs. A cutting tool shall be attached to the drill rod to produce 110 mm diameter boreholes. Drilling mud shall be used as the circulating fluid to stabilize the borehole and drilling water shall be pumped through the hollow drill rods into the hole to wash out the cutting soils to the ground surface. Flush joint casing with 110 mm diameter are installed to prevent the collapse of the borehole wall in the soft or sandy ground to maintain a clean hole. Clean out the borehole carefully to the test elevation using equipment that will ensure the soil to be tested is not disturbed. The apparent water level in this borehole was monitored during drilling work. Drilling work was carried out under full-time supervision of Geotechnics Myanmar Site personnel.

    Rock coring

    The rotary drilling machine is used accompanied with NMLC core barrel. After taking out coring tool from boreholes, the rock samples are placed properly in a standard core box, labeled and photographed.

    Soil boring and rock coring 01
    Soil boring and rock coring 02
    Soil boring and rock coring 03
    Soil boring and rock coring 04
    Soil boring and rock coring 05
    Soil boring and rock coring 06
    Soil boring and rock coring 07
    Soil boring and rock coring 08
    Soil boring and rock coring 09
    Soil boring and rock coring 10
    Soil boring and rock coring 11
    Soil boring and rock coring 12
    Soil boring and rock coring 13
    Soil boring and rock coring 14
    Soil boring and rock coring 15
    Soil boring and rock coring 16
    Soil boring and rock coring 17
    Soil boring and rock coring 18
    Soil boring and rock coring 19
    Soil boring and rock coring 20

    • 1
    • 2
    • 3

    Contact Us

    For more enquires and consultation
    Please contact or pay a visit to our office….

    No. 47, Shu Khin Thar Road, Beside Rose Garde Main Gate, Shwe Pinlon Housing, 27 Ward, North Dagon Tsp., Yangon, Myanmar
    Tel: +95(9) 448007119, +95(9) 790639153, +95(9) 775777723
    Email: info@deltamyanmar.com

    Geotechnics Footer Image 01
    Geotechnics Footer Image 02
    	Geotechnics Footer Image 03
    Geotechnics Copyright